TM 55-1930-209-14&P-19
Table 16-4. Preventive Maintenance Checks and Services
for Ventilation, Heating, and Air Conditioning System (Continued)
B -
Before
D -
Daily
Q - Quarterly
D -
During
W -
Weekly
S - Semiannually
A -
After
M -
Monthly
A - Annually
INTERVAL
ITEM
PROCEDURES
EQUIPMENT
ITEM
TO BE
CHECK FOR AND HAVE
IS NOT READY/
NO.
INSPECTED
REPAIRED OR ADJUSTED
AVAILABLE IF
B D A D W M Q S A
AS NECESSARY
VOIDS
VENTILATION
SYSTEM
NOTE
If the voids ventilation system equipment
fails to operate, troubleshoot according to
TM 55-1930-209-14&P-16. Report deficien-
cies and failures to the shift leader or
bargemaster. Use proper forms to describe
maintenance or repair problems. Keep ven-
tilation, heating, and air conditioning sys-
tem operations and PMCS logs current.
1
Hatches
a. Make sure hatch covers that are in open
position are secured with cotter pins and
cotter keys.
b. Check for damage to watertight hatches
Hatches are dam-
and light-proof louvers. Repair as neces-
aged or leak.
sary.
c.
Check for rust, corrosion, and worn or
chipped paint. Remove by wire brushing,
chipping or scraping. Immediately paint
cleaned area with zinc chromate paint
and finish to match surrounding area in
accordance with TB 43- 0144.
2
Air Ducts
WARNING
Always make sure that electrical power is
OFF before performing any maintenance on
electrical systems. Redtag appropriate
switches and circuit breakers with:
"WARNING - DO NOT ACTIVATE. REPAIRS
BEING MADE." Observe all safety precau-
tions listed at the beginning of this manual.
a. Make sure that air ducts are free of
Air ducts are dam-
obstructions, dents, and other damage.
aged or obstructed.
b. Check for rust, corrosion, and worn or
chipped paint. Remove by wire brushing,
chipping, or scraping. Immediately paint
cleaned area in accordance with TB 43-
0144. Do not paint threads or labels.
c.
Check for loose or missing fasteners and
securements. Tighten or replace as nec-
essary.
16-12