TM 55-1930-209-14&P-19
Table 16-4. Preventive Maintenance Checks and Services
for Ventilation, Heating, and Air Conditioning System (Continued)
B -
Before
D -
Daily
Q - Quarterly
D -
During
W -
Weekly
S - Semiannually
A -
After
M -
Monthly
A - Annually
INTERVAL
ITEM
PROCEDURES
EQUIPMENT
ITEM
TO BE
CHECK FOR AND HAVE
IS NOT READY/
NO.
INSPECTED
REPAIRED OR ADJUSTED
AVAILABLE IF
B D A D W M Q S A
AS NECESSARY
HEATING
AND AIR
CONDITIONING
(HAC) SYSTEM
WARNING
Make sure electrical components and cir-
cuits are turned OFF before starting any
inspection and/or cleaning. Observe
safety precautions specified in this man-
ual.
a. Make sure that air outlets and ventilators
Air outlets and
are free of obstruction and not damaged.
ventilators are
damaged or
obstructed.
b. Inspect HAC system operating controls
Controls not oper-
for damage. Notify shift leader of defi-
able.
ciencies.
c.
Check HAC cooling and heating systems
for proper operation. Notify shift leader
of deficiencies.
d. On barge 1 only, check each activated
Fuses blown.
forced air heater for proper operation.
Check fuses and replace as necessary.
e. On barge 1 only, check that air flow from
activated forced air heater is unob-
structed. Clear area around heater of any
material which could be a fire or safety
hazard.
f.
Check drain for condensation or leaks.
Class III leaks.
Notify shift leader of class III leaks.
16-14