TM 55-1930-209-14&P-6
Table C-1. Preventive Maintenance Checks and Services for Shore Discharge System (Continued)
B - Before
D - Daily
Q - Quarterly
D - During
W - Weekly
S - Semiannually
A - After
M - Monthly
A - Annually
Interval
Procedures
Item
Check For And Have
Equipment
Item
To Be
Repaired Or Adjusted
Is Not Ready/
No.
B
D
A
D
W
M
Q
S
A
Inspected
As Necessary
Available If
3
Hydraulic Power
a. Check reservoir level gauge (Void 5)
Unit Reservoir
to assure reservoir full of oil. Add oil
Level Gauge
if necessary (use proper grade for
extreme heat/cold).
b.
When oil temperature is 450F or less, set
heater ON/OFF switch to ON.
c.
Replace hydraulic fluid in the hydraulic
power unit reservoir. Fill with Gulf Har-
mony 46 AW or military equivalent as
follows:
1)
Place container under reservoir to
catch hydraulic fluid.
2)
Remove drain plug. Drain fluid into
sludge tank by sucking up fluid with
bilge drain system foot valve.
3)
When reservoir is completely drained,
replace plug. Wipe plug and area
around plug clean.
4)
Remove and clean suction strainer.
5)
Remove filler/breather cap.
6)
Clean filter if necessary.
7)
Fill reservoir with Gulf Harmony 46
AW or military equivalent until oil level
sight gauge indicates 100 percent full.
8) Replace cap.
9) Wipe clean reservoir and immediate
area.
4
Hydraulic
Check that charge pressure gauge on
Power Unit
hydraulic power unit reads no less than
Charge Pressure
250 psi. Minimum pressure needed for
Gauge
proper stroke control and makeup flow for
winch circuit.
5
Hydraulic
Check hydraulic fluid level is 80 percent
Power Unit
or more full. Add fluid if necessary as
Level Gauge
follows:
C-4