TM 10-4320-317-13
NOTE
Remove caps or packaging material from ends of hose.
(a) Remove 6-inch boltless coupling (para. 2-8.c) from leading ends of hose.
CAUTION
After removing components from boxes, be sure to protect them from
sand and grit. Sand and grit may cause equipment failure.
(b) Connect leading end of fourth hose to trailing end of hose of third hose with 6-inch boltless coupling (para. 2-
8.b.).
(c) Connect swivel joint to leading end of third hose with 6-inch boltless coupling (para. 2-8.b.).
(d) Connect trailing end of second hose to swivel joint with 6-inch boltless coupling (para. 2-8.b.).
(e) Connect leading end of hose of second hose to trailing end of hose of first hose with 6-inch botless coupling
(f)
Connect swivel joint to trailing end of hose of fourth hose with 6-inch boltless coupling (para. 2-8.b.).
(g) Connect leading end of first hose (1, Figure 2-8) to relief valve (2) on discharge of lead pumping station.
Figure 2-8. Connecting 10-Mlle Segment to Lead Pumping Station
2-30