TM 10-4610-229-24
2-17. INSTRUMENT PANEL ASSEMBLY REPLACEMENT (CONT)
5
Unscrew line nut. Disconnect oil tube from oil pressure gage. Remove elbow.
6
Pull temperature sensor line through rubber grommet.
7
Remove instrument panel assembly.
8
Remove two nuts and bolts. Remove voltage regulator from mounting bracket.
b.
Installation
1
Install voltage regulator on mounting bracket. Install two bolts and nuts.
2
Install elbow on oil pressure gage. Install oil tube on elbow. Tighten line nut.
3
Connect all wires to switches and gages. Solder as required. Connect wires to voltage regulator. Remove tags.
4
Pull temperature sensor line through rubber grommet.
5
Aline holes on instrument panel and mounting bracket. Install four flatwashers, bolts, lockwashers, and nuts.
6
Install temperature sensor in engine. Tighten line nut.
7
Secure temperature sensor line with wire ties as required.
8
Connect battery (2-16).
9
For raw water pump assembly: Install shrouds (para 2-34).
2-47