TM 10-4610-232-12
Table 4-1. Unit Preventive Maintenance Checks and Services
Item
No.
Interval
Item To Be
Check Or
Service
Procedure
Not Mission
Capable If:
28.
Annual
Control Panel
Check control panel pressure
Correct activation cannot
cannot switch actuation point.
be obtained.
29.
Annual
Diesel Heaters
a. Notify DS maintenance to remove
excess carbon from heater
burner head.
b. Notify DS maintenance to
check heater blower motor
bushes and clean blower motor
assemblies with compressed air.
30.
2,500 Hours
Raw Water Pump
Notify DS maintenance to replace
Assembly
mechanical seal in pump and
inspect pump for internal wear.
31.
2,500 Hours
High Pressure
Notify DS maintenance to replace
Pump Assembly
valve disks and check valve seat
for wear.
32.
2,500 Hours
Flowmeter
Notify DS maintenance to check
Sending Units
paddles and pins on the three
units for damage, wear and ease
of rotation.
33.
5,000 Hours
High Pressure
Notify DS maintenance to replace
Pump Assembly
plunger packing and inspect
plungers for wear.
34.
5,000 Hours
Cyclone Separator
Notify DS maintenance to inspect
Assembly
separator lines for wear.
35.
10,000
Air Compressor
Notify DS maintenance to replace
Hours
air compressor assembly high
pressure air relief valve.
36.
10,000
Air System
Notify DS maintenance to replace
Hours
air system low pressure relief valve.
37.
20,000
Raw Water Pump
Notify DS maintenance to replace
Hours
Assembly
motor bearings.
38.
20,000
Air Compressor
Notify DS maintenance to replace
Hours
motor bearings.
39.
20,000
Distribution
a. Notify DS maintenance to replace
Hours
Pump Assembly
mechanical seals in the pumps
and Booster
and inspect pumps for internal
Pump
wear.
b. Notify DS to replace motor
bearings.
4-12 Change 2