TM 10-4610-232-34Table 2-1. Direct Support Troubleshooting Guide (Continued)MALFUNCTIONTEST OR INSPECTIONCORRECTIVE ACTIONStep 2. Check continuity from TDK1 (terminal 1) to J13T.(a) Repair any loose or damaged wire (para. 2-20).(b) Replace/repair connector J13 if faulty (para. 2-21).(c) Replace TDK1 if the checks done in steps 1 and 2 are okay (para. 2-23).Step 3. Check the air blowdown solenoid valve connector, P28 (REF: Interconnection diagram FO-2, Sheet 14), fordamage or loose pins.Repair the connector, if necessary (para. 2-7).Step 4. Check for resistance across pins P28A and P28B of the air blowdown solenoid valve connector.If the multimeter reads infinity or a short circuit, replace the air blowdown solenoid valve (para. 2-48).Van lights do not work. (Ref. Schematic diagram FO-1, sheet 10, schematic lines 1026-1030).Shut down ROWPU and generator. Refer to electrical drawings in Appendix D. Check continuity, point-to-point, fromtransformer T1(X1) (REF: Interconnection diagram FO-2, Sheet 10) to J12C (REF: Interconnection diagram FO-2,Sheet 9). Repeat the procedure from T1(X2) to connector J10B (REF: Interconnection diagram FO-2, Sheet 9). Checkcontinuity from J13I (REF: Interconnection diagram FO-2, Sheet 9) to J10A. Check continuity from J12G to J13N andfrom J12H to J13P.(a) Repair any loose or damaged wire (para. 2-20).(b) Replace circuit breakers CB7 or CB10 (REF: Interconnection diagram FO-2, Sheet 8) if open (para.2-23).(c) Replace/repair connectors J12, J13 or J10 if they are faulty (para. 2-21 ).HEAT TRACE.Heat trace does not work. (Ref. Schematic diagram FO-1, sheet 11, schematic lines 1102-1104).Shut down ROWPU and generator. Refer to electrical drawings in Appendix D. Check continuity, point-to-point, fromtransformer T2(1D) (REF: Interconnection diagram FO-2, Sheet 10) to the panel connector of the non-operating heattrace. Repeat the procedure from T2(2D) to the panel connector of the non-operating heat trace.(a) Replace/repair the electrical connector, if faulty (para. 2-21).(b) Test switch SS6 (REF: Interconnection diagram FO-2, Sheet 12) and replace if faulty (para. 2-22).(c) Test circuit breaker CB12 (REF: Interconnection diagram FO-2, Sheet 8) and replace if faulty (para.2-23).(d) Replace relay K27 (REF: Interconnection diagram FO-2, Sheet 8) if the A2 contacts are open (para.2-23).UTILITY CIRCUITS. Utility receptacle, panel light or control panel receptacle does not work. (Ref. Schematic diagram FO-1, sheet 11, schematiclines 1117-1126).Shut down ROWPU and generator. Refer to electrical drawings in Appendix D. Check continuity, point-to-point, fromtransformer T2(1C) (REF: Interconnection diagram FO-2, Sheet 10) to the non-working receptacle or panel lightconnections. Repeat the procedure from T2(2C) to the non-working receptacle or panel light connections.(a) Repair any loose or damaged wire (para. 2-20).(b) Replace/repair any electrical connector which is damaged (para. 2-21 ).(c) Replace SR9 (REF: Interconnection diagram FO-2, Sheet 13) receptacle if it is not working (para.2-24).(d) Replace the panel light receptacle, if faulty (para. 4-29 of -12 manual).(e) Replace the panel light switch PB10 (REF: Interconnection diagram FO-2, Sheet 12), if faulty (para.2-22).(f) Replace relay K27 (REF: Interconnection diagram FO-2, Sheet 8) if it shows open across the A2contacts (para. 2-23).2-40Change 1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business