TM 10-4610-239-24
TM 08580B-24/3
Section XIX. PREPARATION FOR STORAGE OR SHIPMENT
2-139.
SECURITY PROCEDURES. Refer to AR 190-11 or 190-13.
2-140. PREPARATION FOR MOVEMENT . Refer to TM 10-4610-239-10 to prepare the
ROWPU for movement.
2-141. SHORT-TERM (ADMINISTRATIVE) STORAGE . Placement of equipment in administrative storage should be
for short periods of time when a shortage of maintenance effort exists. Items should be in mission readiness within 24
hours or within the time factors as determined by the directing authority. During the storage period, appropriate
maintenance records will be kept.
a. Before placing equipment in administrative storage, current maintenance services and equipment serviceable
criteria (ESC) evaluations should be completed, shortcomings and deficiencies should be corrected, and all modification
work orders (MWO's) should be applied.
b. Remove R.O. elements and end cap O-rings, calcium hypochlorite (chlorine), spare parts, and consumables from
the ROWPU.
c. Attach tag to pressure vessels that reads "R.O. elements and end cap O-rings have been removed. Reinstall
before operating unit."
d.
Cover the ROWPU with the tarpaulin furnished.
e. Storage site selection. Inside storage is preferred for items selectedfor administrative storage. If inside storage is
not available, trucks, vans, cone containers and other containers may be used.
2-343/(2-344 blank)