TM 10-4610-246-13
4.19
MAINTENANCE OF RESERVOIR TANK ASSEMBLY
This task covers:
a.
Repair
b.
Installation
INITIAL SETUP
Equipment Conditions
Hypochlorination unit is shut down and drained (para 2.9).
Foot valve and suction tubing removed (para 3.5).
a. Removal.
Slide reservoir (1) out of frame assembly bracket
(2).
b. Installation
(1) Clean replacement reservoir (1, Figure 4-8).
(2)
Slide reservoir into frame assembly bracket
(2).
(3)
Install foot valve and suction tubing (refer to
para 3.5).
Figure 4-8. Reservoir Tank Assembly
4-17