Table 9. Extended Distribution Hose Heating Blanket Installation and Connection List.
Hose
Heating Blanket
Connect to
Pump Skid
Junction Box
One 5 ft. product water suction hose P03
2 in. x 6 ft. blankets P03-1, long cable
P-8
One 5 ft. product water suction hose P03
2 in. x 6 ft. blankets P03-2 longest cable
P-8
One 5 ft. product water suction hose P04
2 in. x 7.1 ft. blankets P04, short cable
P-8
Two 65-ft product water discharge hoses P05
Two 2 in. x 65.5 ft blankets P05
P-8
PO5
PO3-2
P-8
DIESEL PUMP P-8
P-7
PO4
T7
T5
T6
T3
T4
P02
PO3-1
TWPS
Figure 32. Extended Distribution Hose Heating Blanket Power Cable Connection Diagram.
5. Install a pump skid insulating cover on Pump Skid P-8 as follows (see Figure 33):
a. Install the corrugated exhaust hose on the diesel engine muffler exhaust.
b. Place the cover over the pump skid.
c. Secure the buckle to draw the bottom tight around the skid.
d. Secure the hook and loop seams at the hose inlet and outlet.
FLAP
HOOK AND LOOP SEAM
P-8 COVER
BUCKLE
Figure 33. P-8 Pump Skid Insulating Cover Installation.