ARMY TM 10-4610-309-14
MARINE CORPS TM 10802A-14/1
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
0017 00
OPERATOR INSTRUCTIONS
STANDBY OR SHORT-TERM SHUTDOWN OPERATION UNDER
USUAL CONDITIONS
Table 1 provides a summary of standby and short-term shutdown requirements.
Table 1. Summary of Standby and Short-Term Shutdown Requirement.
Shutdown
Operating
Shutdown
Shutdown
Type
Conditions
Duration
Requirements
Standby
Normal Operation
Four hours or less
Shutdown without drain down or with
shutdown
drain down as required.
Cold Weather
30 minutes or less
Shutdown without drain down. TQG,
with TQG in
heat blankets, pump heat collars and
operation
diesel fuel fired space heater remain
on.
15 minutes or less
Shutdown without drain down.
with TQG secured
Short term
Normal operation
54 hours or less
Double product water backwash of the
shutdown
MF and product water flush of the RO.
Cold weather
30 minutes to 54
Shutdown with complete drain down
hours and whenever
including multiple drain of MF and air
TQG is secured for
purge drain of the RO. Flushing is not
more than 15
required.
minutes
.
The standby and short-term shutdown procedures covered in this work package include:
Standby Shutdown without Draining Down
Standby Shutdown - Cold Weather Operation
Standby Shutdown with Drain-Down
Short Term Shutdown - Normal Operation
Short Term Shutdown - Cold Weather Operation
Raw Water Diesel Engine Shutdown
0017 00-2