ARMY TM 10-4610-309-14
MARINE CORPS TM 10802A-14/1
0063 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
UNIT MAINTENANCE PROCEDURES
POWER DISTRIBUTION SYSTEM
MAIN CIRCUIT
BREAKER HANDLE
REAR
DOOR
NUT
BRACKET
GASKET
SCREW
WASHER
GASKET
FRONT
HANDLE
BRACKET
POWER DISTRIBUTION
BOX DOOR
Figure 17. Main Circuit Breaker Handle Replacement.
2. Install new main circuit breaker handle as follows:
a. Position the handle, front bracket and gasket on the front of the power distribution door
and align with the holes in the door.
b. Insert the two screws into the holes.
c. Position the rear bracket on the screw inserts at the rear of the power distribution box
door.
d. Install the two nuts and washers to the screw inserts. Do not tighten.
e. Close the power distribution box door slowly and check that the hole of the rear bracket is
aligned with the main power circuit breaker switch on the power distribution panel. If it is
not, make the necessary adjustment.
f. Tighten the two nuts on the rear bracket.
END OF WORK PACKAGE
0063 00-30