TM 10-4610-310-14
0059 00
MALFUNCTION
TEST/INSPECTION
CORRECTIVE ACTION
Check connection and
Tighten loose connection.
Replace or repair broken wires
module junction box to valve
and connections.
V3C.
Inside the control module.
2. Valve will not open
Check surge suppressor
voltage is not available.
SP19 fault light
(continued)
Tighten loose connection.
from output 6 of PLC
Replace or repair broken wires
output card 1(OC1) to the
and connections.
pin H on connection plug
Check PLC lights
Check for loose or missing
Tighten bolts
bolts in body
3. Leaking
Check O-rings for damage
Follow all the procedure
Follow the procedure for "valve
for "valve will not open"
will not open"
Check all UF hoses for
Straighten out the kinked hose
kinks
Check all UF piping and
4. valve will not close
hoses up stream of the
Removed the clogging material
valve for clogging material
Remove and inspect the
diaphgram from the valve
and check for cleanliness.
Ensure that all the pores in
the diaphgram is free of
deposits.
0059 00-2