II.
RECYCLINC/ACCUMULATING SYSTEMS GENERAL SPECIFICATIONS
III.
INSTALLATION INSTRUCTIONS
A.
Uncrating and Shipping Damage:
Uncrate the unit carefully and check the contents of the various boxes against the packing list enclosed. Look for
visible SIGNS of damage and REPORT ANY DAMAGE TO THE CARRIER IMMEDIATELY. Check all electrical
terminals and connections for tightness (paying particular attention to the large rubber covered cables in the low voltage
D.C. circuits going from the power supply to the cells). Check all plug-in relays, etc., for full contact with socket.
3