TM 55-1 930-209-14&P-5
(d) Troubleshoot as provided in Chapter 4, Table 4-1, problem 14.
(e) When drinking water is to be discharged again, start shore discharge pump by positioning HAND/OFF/AUTO
switch on motor controller to AUTO.
(4)
If alarms are energized by salinity sensor, perform the following:
(a) Stop discharge pump by moving HAND/OFF/AUTO switch on motor controller to OFF.
(b) Press red flashing SALINITY key on EMS keyboard to change EMS video monitor ALARM display page back
to SALINITY display page.
(c) Press ACK key on EMS keyboard to stop alarms and automatically change red flashing SALINITY key to white
and stop flashing display on video monitor SALINITY display page. This FW DISCHG display continues to
show in double intensity until problem is solved.
(d) Troubleshoot as provided in Chapter 4, Table 4-1, problem 3.
(e) When drinking water IS to be discharged again, start shore discharge pump by positioning HAND/OFF/AUTO
switch on motor controller to AUTO.
(5)
If alarms are energized by pressure sensor, perform following steps'
(a) Stop discharge pump by moving HAND/OFF/AUTO switch on motor controller to OFF.
(b) Press red flashing SYSTEM STATUS key on EMS keyboard to change EMS video monitor ALARM display
page back to SYSTEM STATUS display page.
(c) Press ACK key on EMS keyboard to stop alarms and automatically change red flashing SYSTEM STATUS
key to white and stop flashing display on video monitor SYSTEM STATUS display page This DISCH PRESS
display continues to show in double intensity until problem is solved.
(d) Troubleshoot as provided In Chapter 4, Table 4-1, problem 4.
(e) When drinking water Is to be discharged again, start shore discharge pump by positioning HAND/OFF/AUTO
switch on motor controller to AUTO
j. When discharge pump operation Is to be stopped, set HAND/OFF/AUTO switch to OFF
3-6.
Discharging drinking water through port discharge valve
3-6.1.
Discharging drinking water to another vessel
a.
Perform steps b and c In paragraph 3-5
b.
Close valve DW14 (Barges 2 and 3 only).
c.
Perform step f In paragraph 3-5
d
Remove protective cap from discharge line at valve DW15.
e.
Open valve DW19 on Barges 2 and 3.
On Barge 1, position valve DW14 to port discharge
f.
Connect hose from other vessel to valve line.
g
Open valve DW15.
NOTE
If drinking water is to be supplied through valve DW15 to another vessel, and this valve outlet has not been used
recently, flush system for several minutes before connecting discharge hose. After this has been completed, hook up
discharge hose from other vessel.
3-13