TM 10-4610-215-10
TM 08580A-10/1
Table 2-3. Operator/Crew Preventive Maintenance Checks and Services
(Unit) (Continued)
B - Before
D -During
A - A f t e r
W - Weekly
For readiness reporting
Interval
Procedures
Equipment Is not
Item
Item to be
Cheek for and have repaired
ready/available
No.
B D A
W
inspected
or adjusted as necessary
if:
37
Circuit breakers
Inspect for cracked or broken
Any circuit breaker
parts. Before connecting
is damaged or will
generator set, check for free
not move easily
movement of handle.
Inspect for signs of burning
or arcing.
38
Water testing
Check for cracked or broken
equipment:
glass. Check to see that all
lab beaker,
markings are readable. Re-
graduated cylin-
place damaged items.
der, solution
indicator, ther-
mometer
CAUTION
When checking rupture disc, do
not overtighten the hold down
screw. Finger tighten and then
tighten 1/8 turn with wrench.
39
Rupture disc
Before operation make sure
A rupture
assembly
an intact rupture
disc is not in
place.
place.
Check for leaks around
There is leakage
rupture disc assembly.
around rupture disc
seat.
40
Pulse dampener
Inspect for broken, rusted,
There is any dam-
or missing mounting hard-
age to weldment.
ware. Check for cracks on
weldment. Inspect for leaks.
41
High-pressure
Inspect for rust. Check for
There is leakage
relief valve
leakage at base of relief
at relief valve
valve.
union to pipe.
2-27
