TM 10-4610-229-24
2-69. GAGE PANEL ASSEMBLY REPLACEMENT/REPAIR (CONT)
NOTE
Two persons are required for next two steps.
8
Have one person support the panel. Remove six nuts, lockwashers, and bolts connecting panel to frame.
Remove panel.
9
Have one person support the panel. Aline holes on panel and frame. Install six bolts, lockwashers, and nuts.
10
Aline holes on panel and support frame. Install two bolts, lockwashers, and nuts.
11
Install U-bolt, two flatwashers, and nuts on inlet pipe.
12
Install three pressure indicator gages (subpara e).
13
Install two pressure differential switches (subpara d).
14
Install toggle switch (subpara c).
15 Install rheostat (subpara b).
16
Install utility lamp (para 2-20).
2-70. CHEMICAL METERING PUMP REPLACEMENT/REPAIR
This task covers:
a.
Fuse Replacement
d.
Dosing Head Assembly
b.
Pump Removal
e.
Pump Installation
c.
Dosing Head Disassembly
INITIAL SETUP
Use With
Supplies
Pretreatment Assembly
Solder, item 31, appendix C
Tags, item 34, appendix C
Tools
General Mechanic's Automotive
Tool Kit, item 10, appendix B
2-170