TM 10-4610-229-24
Section II. MAINTENANCE PROCEDURES
3-2. GENERAL. This section contains maintenance instructions authorized by the maintenance allocation chart (MAC),
appendix B, and by the source, maintenance, and recoverability (SEIR) coded items to support the ROWPU at the direct
support maintenance level. Unless otherwise noted in the procedure, the system must be shut down before performing
maintenance. (See TM 10-4610-229-10.)
3-3. HIGH PRESSURE HOSE ASSEMBLY REPAIR
This task covers repair only.
INITIAL SETUP
Tools
Reference
General Mechanic's Automotive
Drawing No. 13214E9225
Tool Kit, item 10, appendix B
Common No. 1 Organizational
Equipment
Maintenance Automotive
Condition
Maintenance and Repair Shop
Para
Condition Description
Equipment, item 11, appendix B
Swaging press, item 53,
2-13
High pressure hose
appendix B
removed.
Banding tool, item 17, appendix B
Supplies
Welding rods, item 30, appendix C
NOTE
Repair of the high pressure hose is performed by fabricating a new hose.
1
Install coupling in each end of hose.
3-6