TM 10-4610-229-24
2-25. ENGINE REPLACEMENT (CONT)
2
Remove four nuts, lockwashers, bevel washers, bolts, and flatwashers.
3
Remove engine.
4
Remove lifting device and sling.
b.
Installation
1
Using suitable lifting device and sling, install engine.
2
Install four flatwashers, bolts, bevel washers, lockwashers, and nuts.
3
Remove blocks and lower skid.
4
Remove lifting device and sling.
5
Install instrument panel (para 2-17).
6
Install water pump (para 2-23).
7
Install battery cables (para 2-15).
2-26. FUEL TANK REPLACEMENT/REPAIR
This task covers:
a.
Fuel Filter Removal
d.
Sending Unit Installation
b.
Fuel Filter Installation
e.
Tank Removal
c.
Sending Unit Removal
f.
Tank Installation
INITIAL SETUP
Use With
Supplies
Raw Water Pump Assembly
Fuel, item 11, appendix C
Rags, item 29, appendix C
Tools
General Mechanic's Automotive
Tool Kit, item 10, appendix B
Common No. 1 Organizational
Maintenance Automotive
Maintenance and Repair Shop
Equipment, item 11, appendix B
2-70