TM 10-4610-239-24
TM 08580B-24/3
INSTALLATION. (Cont)
f.
At input end of each of the bottom three R.O. pressure tubes, position pipe section (15) and
install clamp (10), screw (9), and nut (8).
g.
At input end of all four R.O. pressure tubes, position pipe section (7) and install two gaskets (6)
and clamps (5) and four bolts (4) and nuts (3).
h.
At each end of all four R.O. pressure tubes, install flexible tubing (2) and tighten hose clamp (1).
2-166