TM 10-4610-239-24
TM 08580B-24/3
2-94. REPLACE PIPING.
This task covers: a. Removal. b. Installation.
INITIAL SETUP.
a.
Tools.
Tool Kit (Appx B, Sect HI, Item 10).
b.
Materials/Parts.
Antiseize Tape (Appx C, Sect II, Item 17).
c.
Equipment Condition.
Power shut down (power source manual).
ROWPU shut down (TM 10-4610-239-10.
d.
General Safety Requirements.
WARNING
ROWPU piping and equipment can contain extremely high
pressure during and after operation. If this pressure is not
relieved before working on these pipes or equipment, serious
injury or death may occur. Be sure to open all drains and vents
before beginning any disassembly.
NOTE
Pipe sections in the ROWPU are designed to interconnect within
the unit to provide for continuous flow of water being processed.
This task gives typical procedures for all piping and installation
hardware found in the ROWPU.
REMOVAL.
PIPE TO PIPE
2-220