TM 10-4610-239-24
TM 08580B-24/3
3-50.
REPLACE CHEMICAL FEED METERING PUMP CABLE ASSEMBLY.
This task covers:
a. Removal.
b. Installation.
INITIAL SETUP.
a.
Tools. Tool Kit (Appx B, Sect III, Item 10).
b.
Materials/Parts.
Tape, Electrical (Appx C, Sect II, Item 18).
c.
Equipment Condition.
Power shut down (power source manual).
ROWPU shut down (TM 5-4610-239-10).
3-210