TM 10-4610-241-24
TO 40W4-13-42
3-15.
CABLE ASSEMBLY, W45 (DISTRIBUTION PUMP)
This task consists of:
a.
Inspection
b.
Disassembly
c.
Repair
d.
Assembly
e.
Test
INITIAL SET-UP:
Tools Required
Per TM 43-0158/TO 1-1A-15(Air Force)
Material/Parts Required
Per TM 43-0158/TO 1-1A-15(Air Force)
Equipment Condition
Reference
Cable Assembly removed (Paragraph 2-21).
a.
Inspection.
For inspection procedures, refer to TM
43-0158/TO 1-1A-15(Air Force).
b.
Disassembly.
For disassembly procedures, refer to TM
43-0158/TO 1-1A-15(Air Force).
c.
Repair.
For repair procedures, refer to TM 43-
0158/TO 1-1A-15(Air Force).
d.
Assembly.
For assembly procedures, refer to TM
43-0158/TO 1-1A-15(Air Force).
E
Test.
Test cable assembly in accordance with
Paragraph 2-21.
3-135