TM 10-4610-241-24
TO 40W4-13-42
3-53.
JUNCTION BOX ASSEMBLY REPAIR - continued.
f.
Assembly.
(1) Circuit breakers, standoffs and circuit breaker plate.
NOTE
This procedure covers the installation of circuit breaker CB1. All other circuit breakers
are installed in a similar manner.
(a) Install four standoffs (15) with screws (33)
NOTE
Wire tags installed at removal may have fallen off or become illegible If this happens,
check electrical interconnecting diagram, Appendix F or on back of junction box door for
connection information.
(b) Install flatwashers (19), wire lugs (18) as tagged or in accordance with interconnecting diagram,
lockwashers (17) and nuts (16).
(c) If required, connect spade terminals (20) as tagged or in accordance with interconnecting diagram.
(d) Position insulating plate (6) and circuit breaker plate (5) on studs (15) and install four lockwashers (4) and
screws (3).
3-309