TM 10-4610-241-24
TO 40W4-13-42
3-53.
JUNCTION BOX ASSEMBLY REPAIR - continued.
(2) Control relays.
NOTE
This procedure covers the installation of control relay, K8 The other relay, K9 is installed
in similar manner.
(a) Position bracket (45) on wall of junction box (14) and install screws (44), flatwashers (43), lockwashers
(42) and nuts (41).
(b) Position control relay K8 (40) on bracket (45) and Install two flatwashers (38), lockwashers (37) and
screws (36).
NOTE
Install wires as tagged If tags or missing or illegible, refer to electrical interconnection
diagram in Appendix F of this manual or data plate on back of junction box door.
(c) Position eight wires (35) on relay K8 (40) as tagged during removal or use electrical interconnection
diagram and install six screws (34).
3-310