ARMY TM 10-4610-309-14
MARINE CORPS TM10802A-14/1
0007 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
PREPARATION FOR USE AND INSTALLATION INSTRUCTIONS
SET-UP OPERATION UNDER USUAL CONDITIONS
c.
Move the cyclone separator into place. Make sure that the location selected for the
separator will hold the weight of the cyclone when filled with water without the cyclone
tipping over.
d. Place an absorbent pad under Diesel-Driven Pump Skid P-1 for environmental protection
in the event of a fuel spill.
A-03
A-01
A-02
A-04
A-05
PRIMING
VENT HOSE
P-2
2 X 6 D-HOSE
2 X 50 D-HOSE
2 X 10 S-HOSE
WASTE HOSE
CYCLONE SEPARATOR
P-1
2 X 50 D-HOSE
Figure 1. P-1 Pump to P-2 Pump to Cyclone Separator Configuration Deployment.
e. Install the fuel tank on Diesel-Driven Raw Water Pump Skid P-1 as follows (see Figure
2):
1) Set the fuel tank assembly on the pump skid.
2) Connect the red-banded fuel tank fuel supply hose to the red-banded engine fuel
supply hose with the quick-connect fittings.
3) Connect the yellow-banded fuel tank return hose to the yellow-banded engine
fuel return hose with the quick-connect fittings.
YELLOW-BANDED
FUEL TANK ASSEMBLY
FUEL RETURN HOSE
RED-BANDED
FUEL SUPPLY HOSE
DIESEL ENGINE-DRIVEN
YELLOW-BANDED
PUMP SKID
FUEL RETURN HOSE
RED-BANDED
FUEL SUPPLY HOSE
Figure 2. Diesel-Driven Pump Fuel Tank Installation.
0007 00-4