ARMY TM 10-4610-309-14
MARINE CORPS TM 10802A-14/1
0028 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
OPERATOR INSTRUCTIONS
PREPARATION FOR MOVEMENT ARMY UNIT
8. Stack the following items on top of BII box #5 and the buckets (see Figure 12):
50-ft. hose heating blankets (2 each)
41-ft. hose heating blanket (1 each)
21-ft. hose heating blanket (1 each)
66-ft. hose heating blanket (1 each)
11-ft. hose heating blankets (3 each)
6-ft. hose heating blanket (2 each)
motor-driven pump skid covers (3 each)
MOTOR-DRIVEN PUMP
SKID COVERS
6-FT BLANKET
P04 DISTRIBUTION
6-FT BLANKET
PUMP SUCTION
P04 DISTRIBUTION
PUMP SUCTION
11-FT BLANKETS
66-FT BLANKET
F01 RAW WATER
P05 DISTRIBUTION
SUCTION
HOSE
21-FT BLANKET
50-FT BLANKET
F07 MF PUMP
F03 RAW WATER
DISCHARGE
DISCHARGE
41-FT BLANKET
P02 PRODUCT
WATER
50-FT BLANKET
F03 RAW WATER
PUMP SKIDS
DISCHARGE
Figure 12. Operator Station Packout 3
WARNING
Two person lift. Two people are required to safely move the pump skids. Lift with
your legs, not your back. Failure to observe this warning may result in back injury.
9. Install the fire extinguisher in its bracket on the S-2 strainer.
10. Place the motor-driven pump skids side by side in front of BII Box #4 with the motors facing out
(see Figure 12).
0028 00-25