ARMY TM 10-4610-309-14
MARINE CORPS TM 10802A-14/1
0028 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
OPERATOR INSTRUCTIONS
PREPARATION FOR MOVEMENT ARMY UNIT
13. Place the pump priming pitcher inside one of the pump skids and secure it with an 18-in. hook
and loop strap (see Figure 15).
14. Attach the long end of a 10-ft. ratchet strap to the TWPS frame above the feed flow control panel
and temporarily lay it out of the way on top of the packed out heating blankets.
15. Place the following items on top of the pump skids (see Figure 15):
The remaining four BII boxes
Water Quality Analysis Set: Purification (WQAS-P)
Operator's tool box
Main ventilation plenum
1000-gallon MF feed tank
6 ft. hose heating blanket
Floating inlet strainer
16. Retrieve the 10-ft ratchet strap from on top of the heating blankets, route it around the 1000-
gallon MF feed tank and 6-ft hose heating blanket. Attach the strap to the TWPS frame and
tighten (see Figure 15).
FLOATING INLET
1000 GALLON MF FEED TANK
STRAINER
6 FT. HOSE
MAIN VENTILATION PLENUM
HEATING BLANKET
10-FT RATCHET STRAP
WQAS-P
OPERATORS' TOOL BOX
PRIMING PITCHER
BII BOXES (4)
18-IN.
HOOK AND
LOOP STRAP
PUMP SKIDS (2)
Figure 15. Operator Station Packout 5.
0028 00-27