ARMY TM 10-4610-309-14
MARINE CORPS TM 10802A-14/1
0029 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
OPERATOR INSTRUCTIONS
PREPARATION FOR MOVEMENT MARINE CORPS UNIT
WARNING
Three person lift. Three people are required to safely move the MF pump skid.
Use your legs, not your back. Failure to observe this warning may result in back
injury.
6. Move the MF pump skid onto the TWPS skid. Position the pump end inside the mounting
brackets and install the retaining rod.
7. Place the three short rolled-up discharge hoses inside the pump skid (see Figure 16).
8. Stack the closed bisulfite and citric acid chemical buckets on top of each other next to the cyclone
separator, and place the fuel can in front of them (see Figure 16).
9. Place the operator's tool kit on top of the inside high pressure pump motor (see Figure 16).
STACKED, CLOSED CHEMICAL BUCKETS
TOOL KIT
MF PUMP SKID
MOUNTING BRACKET
FUEL CAN
MF PUMP SKID
HOSE
RETAINING ROD
Figure 16. Equipment Area Packout 3.
0029 00-28