TM 10-4610-310-14
0009 00
STARTUP - continued
15. Monitor the pressure on RO pressure gauge while adjusting the RO reject control valve.
16. Observe float inside flow meter (PRODUCT WATER FLOW METER). Flow is read at the top of the float
on the flow meter. See Figure 32.
FLOW
INDICATOR
Figure 32. Product Flow Meter.
WARNING
Do not collect the product water in the product tank until the system is flushed as needed and the water quality
has been established.
17. The LWP is now operational. If the LWP has been preserved for storage, flush the system out by
operating the system without collecting the product water in the product tank for at least 10 minutes.
18. Make sure that water is flowing through the chemical injection/cleaning module. Observe the flow
totalizer for operation. See Figure 33.
Figure 33. Flow Totalizer.
19. See WP 0010 00 for chemical injection instructions and WP 0012 00 for product distribution instructions.
20. Once the water quality has been established according to Tri-Service Standard (less than 1000 ppm of
total dissolved solids (TDS) and at least 2 ppm of Chlorine) in the product water, connect the product
water hose from the chemical module outlet to the product tank inlet spool piece. Turn the product tank
inlet valve open.