TM 5-3800-205-10-2
EXTERNAL AIR TRANSPORT BY CH-47 HELICOPTER - CONTINUED
0016 00
MACHINE DISASSEMBLY AND SECTIONALIZATION - CONTINUED
41.
Stow 54 in. pry bar at front of tank as follows:
a.
Place pry bar first in closed holder, then place in open holder.
b.
Secure pry bar with pin through open holder.
54 IN. PRY PAR
OPEN HOLDER
AND PIN
CLOSED
HOLDER
42.
Secure loose ends of fuel, electrical, air, and hydraulic lines with general purpose straps.
43.
CAUTION
Exhaust pipe must be taped closed to prevent wind from entering exhaust system and causing turbocharger
to spin without the benefit of lubrication. Failure to cover exhaust pipe may damage turbocharger.
44.
Use duct tape (Item 20, WP 0025 00) to cover exhaust extension.
45.
Ensure all compartment doors and BII toolbox on rear deck of water distributor are closed, latched, and secured with
padlocks. Install instrument panel covers and secure with padlocks (WP 0005 00).
46.
Rig sling legs to tractor and water distributor (FM 10-450-5) in accordance with shipping data plates on tractor and
water distributor. Tractor and water distributor are now ready for hookup to CH-47 helicopter.
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during
procedure. Ensure any lifting device used is in good condition and of suitable lift capacity. Keep clear of
heavy parts supported only by lifting device. Failure to follow this warning may result in death or injury
to personnel.
Mud and dirt that are left on components when stowed will result in extra weight in excess of allowable
payload. Ensure components stowed are cleaned prior to stowage to ensure ISU-60 container is not
overweight. Failure to follow this warning may result in death or injury to personnel.
0016 00-34