TM 5-3800-205-10-2
EXTERNAL AIR TRANSPORT BY CH-47 HELICOPTER - CONTINUED
0016 00
MACHINE DISASSEMBLY AND SECTIONALIZATION - CONTINUED
Table 4. Stowage Instructions for ISU-60 Container - Two-Door End.
COMPONENT
STOWAGE INSTRUCTIONS
NOTE
Container center post must be removed to allow stowage of fenders.
Remove retainer and post.
1.
Place in cushion pad at back of shelf.
2.
Secure with three straps.
Fenders
1.
Place right fender in left-rear corner on floor of container.
2.
Place left fender as shown.
3.
Secure fenders with straps.
Container Center Post
1.
Position center post, installing bottom end first.
2.
Raise shelf slightly to lock center post in position.
3.
Install center post retainer and tighten.
CAUTION
Check to ensure all components are securely fastened prior to closing
and securing doors. Failure to do so may result in damage to equip-
ment.
49.
Rig sling legs to ISU-60 container (FM 10-450-5). Container is now ready for hookup to CH-47 helicopter.
MACHINE ASSEMBLY
NOTE
Whenever hydraulic hose quick disconnects need to be connected, operate control levers through all posi-
tions (WP 0004 00) to relieve any trapped hydraulic pressure in hoses. This will facilitate connection of
hoses.
1.
Block tractor and water distributor wheels.
WARNING
Use extreme caution when removing helicopter sling legs. Handrail on right side of tractor was removed for
sectionalization. Until it is installed, personnel must use great care when climbing on tractor. Failure to fol-
low this warning may result in personnel injury.
2.
Remove sling legs from tractor and water distributor. Remove sling legs from container.
3.
Remove tape from all lights. Remove tape from exhaust extension.
4.
Remove all general purpose straps or nylon rope from load, to release loose ends of fuel, electrical, air, and hydraulic
lines.
5.
Remove 54 in. pry bar from stowage at front of tank.
6.
0016 00-39