TM 55-1930-209-14&P-19
Table 4-2. Preventive Maintenance Checks and Services for ROWPU System (Continued)
B -
Before
D -
Daily
Q - Quarterly
D -
During
W -
Weekly
S - Semiannually
A -
After
M -
Monthly
A - Annually
INTERVAL
ITEM
PROCEDURES
EQUIPMENT
ITEM
TO BE
CHECK FOR AND HAVE
IS NOT READY/
NO.
INSPECTED
REPAIRED OR ADJUSTED
AVAILABLE IF
B D A D W M Q S A
AS NECESSARY
2) CHLORINATOR PWR SUPPLY is
normal.
3) BRINE RCIR PMP OPERATING OFF
is normal.
13
Voltage
Check for cracked or frayed connections.
Connections are
Connection
Notify shift leader or bargemaster for
frayed or cracked.
on Cells
corrective action.
14
Ball Valves
Check that ball valves turn freely.
Notify Ball valves do not
shift leader or bargemaster for
turn freely.
corrective action.
4-12