TM 55-1930-209-14&P-19
Table 6-2. Preventive Maintenance Checks and Services for Shore Discharge System (Continued)
B -
Before
D -
Daily
Q - Quarterly
D -
During
W -
Weekly
S - Semiannually
A -
After
M -
Monthly
A - Annually
INTERVAL
ITEM
PROCEDURES
EQUIPMENT
ITEM
TO BE
CHECK FOR AND HAVE
IS NOT READY/
NO.
INSPECTED
REPAIRED OR ADJUSTED
AVAILABLE IF
B D A D W M Q S A
AS NECESSARY
(7) Replace hydraulic fluid in power
unit reservoir. Fill with Gulf Harmony.
46 AW or Military equivalent.
16
Swivel Joint
Lubricate with No. 2 bearing grease or
military equivalent.
Change 1 6-10