TM 10-4320-317-13
(16) Prepare pumping assembly for movement by tow vehicle. Refer to applicable technical manual for water
pumping assembly 600 GPM trailer mounted.
g. Disassemble Lead Pumping Station. Perform the following (Figure 2-42):
Figure 2-42. Disassemble Lead Pump Station
(1)
Disconnect 10-mile segment collapsible assembly (1) from relief valve (2) by removing 6-inch boltless coupling
(2)
Remove relief valve (2) from check valve (4) by removing 6-inch boltless coupling (3) (para. 2-8.c.).
(3)
Remove check valve (4) from pump discharge port (5) by removing 6-inch boltless coupling (6).
(4)
Disconnect 6-inch suction hose (7) from butterfly valve (8) by removing 6-inch boltless coupling (9).
(5)
Disconnect any remaining 6 in. X 10 ft suction hose lengths.
(6)
Remove butterfly valve (8) from 6 in. X 10 ft, rigid-walled, wire reinforced suction hose (10) by removing 6-inch
(7)
Disconnect suction hose (10) from pump discharge port (12) by releasing cams.
(8)
Install plastic cap on pump discharge port (12).
2-64