(21) Using loading diagram on chest lid, pack kit items as indicated.
(22) Transport suspension kit chest to lead pumping station installation site for final packing.
d. Disassemble Pressure-Reducing Valve.
NOTE
Set aside all removed components for repacking.
(1)
downline hoseline segment (3).
(2)
Install 6-inch boltless coupling (1) (para. 2-8.b.) on end of hoseline segment (3).
(3)
Remove 6-inch boltless coupling (4) (para. 2-8.c.) connecting pressure-relief valve (5) to upline hoseline
segment (6).
(4)
Remove 6-inch boltless coupling (7) (para. 2-8.c.) connecting pressure-relief valve (5) to pressure-reducing
valve (2).
Figure 2-39. Disassemble Pressure-Reducing Valve
e. Disassemble Road Crossing Guards.
NOTE
Road crossing guards should be removed and packed after buried hoseline has been removed
free from guards.
(1)
(2)
If planks (2) were nailed to bottom of road crossing guards (1), remove nails. Remove planks and fill hole in
ground.
2-61