TM 10-4610-229-24
2-64. SKID REPLACEMENT (CONT)
b. Installation
1
Attach suitable lifting device and sling to skid. Install skid in proper position.
2
Install instruction plate.
3
Install data plate. Install four rivets.
4
Remove lifting device and sling.
5
Install engine (para 2-43).
6
Install auxiliary fuel valves (para 2-12).
2-65. SKID-MOUNTED PRETREATMENT ASSEMBLY REPLACEMENT
This task covers:
a.
Removal
b.
Installation
INITIAL SETUP:
Use With
Tools
Pretreatment Assembly
Hose wrench, item 8, appendix B
Lifting device, item 13,
appendix B
Sling, item 15, appendix B
a. Removal
1
Unplug pretreatment assembly power cable from outlet on high pressure pump assembly.
2-138