ARMY TM 10-4610-309-14
MARINE CORPS TM 10802A-14/1
0005 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
PREPARATION FOR USE AND INSTALLATION INSTRUCTIONS
EQUIPMENT OFF-LOADING ARMY UNIT
WARNING
Three person lift. Three people are required to safely move the MF pump skid. Lift
with your legs, not your back. Failure to observe this warning may result in back
injury.
5. Remove the MF pump skid.
WARNING
Two person lift. Two people are required to safely move the cyclone separator
assembly. Lift with your legs, not your back. Failure to observe this warning may
result in back injury.
6. Remove the cyclone separator assembly.
7. Remove the discharge hoses, fuel can, and anchor from behind the NBC tank.
8. Remove any items remaining in the equipment area.
CYCLONE SEPARATOR ASSEMBLY
DISCHARGE HOSES
FUEL CAN
ANCHOR
Figure 10. MF Pump Skid Removal.
0005 00-11