ARMY TM 10-4610-309-14
MARINE CORPS TM 10802A-14/1
0005 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
PREPARATION FOR USE AND INSTALLATION INSTRUCTIONS
EQUIPMENT OFF-LOADING ARMY UNIT
Flat Rack Panel, Duct, Suction Hose, and OISS Off-Load
Unpack the remaining items (see Figure 13).
PANEL #7
PANEL #6
OISS HOSES, RISERS AND WELLPOINT ASSEMBLIES
SUCTION HOSE
DUCT
Figure 13. Flat Rack Panel, Duct, Suction Hose, and OISS Off-Load
1.
Unlatch and remove flat rack end panels #6 and #7, located next to the generator.
2.
Remove the three ventilation ducts stored on top of the RO feed tank.
3.
Unlatch and remove flat rack rear panel #5.
4.
Unstrap and remove the suction hoses packed on top of the skid frame.
NOTE
The OISS hoses are color coded yellow. They, along with the OISS risers and
wellpoint assemblies, are separately strapped down on top of the skid frame,
behind the rest of the hoses. The OISS components can be left in place unless the
OISS will be used.
5. Group the suction hoses together and distribute them to their deployed locations in accordance
with the following color coding:
a. Green Raw Water
b. Blue Product Water
c. Red Waste and Chemical Cleaning.
6. Reinstall all the flat rack panels if weather conditions such as rain, snow, or blowing sand require
it. Otherwise, leave the panels off until the TWPS has been started and is operating.
END OF WORK PACKAGE