ARMY TM 10-4610-309-14
MARINE CORPS TM 10802A-14/1
0005 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
PREPARATION FOR USE AND INSTALLATION INSTRUCTIONS
EQUIPMENT OFF-LOADING ARMY UNIT
Generator Area Off-Load
A typical packout of the generator area is shown in Figure 11 and Figure 12. If desired, items that are not
going to be used, such as insulating blankets, may be placed on top of the TWPS flat rack. Unpack the
generator area as follows:
1. From the front of the flat rack, remove the fuel tank assembly and hose heating blankets packed
on top of the generator and the diesel-fired heater.
WARNING
Two person lift. Two people are required to safely move the diesel-fired heater.
Lift with your legs, not your back. Failure to observe this warning may result in
back injury.
Three person lift. Three people are required to safely move the diesel pump skids.
Lift with your legs, not your back. Failure to observe this warning may result in
back injury.
2. Remove the diesel-fired heater and the pump skids.
FUEL TANK
ASSEMBLY
BLANKETS
DIESEL-FIRED
HEATER
PUMP SKIDS (2)
Figure 11. Typical Generator Area Packout - Front.
0005 00-12