ARMY TM 10-4610-309-14
MARINE CORPS TM10802A-14/1
0009 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
PREPARATION FOR USE AND INSTALLATION INSTRUCTIONS
COLD WEATHER SET-UP OPERATION UNDER UNUSUAL CONDITIONS
RETURN AIR ADAPTER
Figure 3. MC-TWPS Winter Cover.
Table 4. Listing of Additional Cold Weather Component for MC-TWPS.
ITEM
QTY
Return Air Adapter
1
Winter Cover
1
Cold weather set-up procedures are very similar to the TWPS set-up under usual conditions. Some new
steps are added and some other steps are changed slightly to address the cold weather conditions.
The procedures covered in this work package include:
Planning and Organization
Locate Fire Extinguisher
TWPS Skid Cover Installation
Diesel Heater Deployment
Place Items to Warm Up
P-1 Pump to P-2 Pump Configuration Deployment
P-2 Pump Only Configuration Deployment
Sodium Bisulfite System Set-Up
Micro-Filtration Equipment Set-Up
Pump, Hose, and Adaptor Heaters and Pump Skid Cover Set-Up
Waste Outlet Connections
Making Power Cable Connections to the TWPS
Heat-Up and Operating Temperature Requirements
Standard Distribution System Set-Up
Raw Water Intake Deployment
Establishing Raw Water Flow
Pre-Operational Checks
Extended Distribution System Set-Up (A-TWPS)
0009 00-5