ARMY TM 10-4610-309-14
MARINE CORPS TM10802A-14/1
0009 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
PREPARATION FOR USE AND INSTALLATION INSTRUCTIONS
COLD WEATHER SET-UP OPERATION UNDER UNUSUAL CONDITIONS
SUPPORT BEAM PAD
SUPPORT BEAM
ROOF
BOLTS AND WASHERS
RETAINING
PIN
Figure 8. Operator Station Overhead Support Beam Removal and Roof Raising.
A-TWPS Fabric Wall Installation
Install the fabric wall as follows (see Figure 9):
1. Unfold the fabric wall and lay it on the ground oriented as follows:
a. The outside of the wall on the ground and the inside of the wall facing up.
b. The bottom of the zippered, roll-up door closest to the TWPS.
c. The 3 in. hose feed-through opposite the raw water inlet of the TWPS.
d. The 4 in. hose feed-through opposite the waste water outlet of the TWPS.
e. The straps laid out for easy access.
WARNING
Potential for head injury. Hold the top panel while removing the pins from the top
panel supports. Failure to do so could result in serious head injuries.
2. Two people carefully remove the pins from the top panel supports and lower the top panel to
about a 45 angle. Insert the pins to hold this position.
3. Attach the top, front and side edges of the wall to the top panel as follows:
a. Lift the fabric wall by the top, front edge.
b. Loop each of the straps through its corresponding footman loop on the top panel and
secure each strap in its buckle.
c. Attach the hook and loop strip on the top edge of the wall to the strip on the top panel.
4. Two people raise the top panel with the attached fabric wall into position.
5. The third person inserts the pins in the top panel supports to secure the top panel.
0009 00-10