ARMY TM 10-4610-309-14
MARINE CORPS TM10802A-14/1
0009 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
PREPARATION FOR USE AND INSTALLATION INSTRUCTIONS
COLD WEATHER SET-UP OPERATION UNDER UNUSUAL CONDITIONS
Install the winter cover top panel as follows (see Figure 5):
1. Lay the winter cover top panel (1) on the top edges of the main cover section, matching the hook
and loop strips on the top panel to the main cover section.
2. Secure each of the twelve straps on the top panel (2) to its matching strap on the top of the main
cover section (3) and tighten.
1
2
3
Figure 5. Winter Cover Top Panel Installation (MC-TWPS).
Install the winter cover back panel as follows (see Figure 6):
1. Orient the winter cover back panel (1) so that the edge of the panel that has three straps is
positioned at the top and the stenciled warning "DO NOT FORK LIFT THIS SIDE" is facing out.
Attach the back panel to the back of the main cover section by matching the hook and loop strips.
2. Secure each back panel top and side strap (2) to its matching strap on the back of the main cover
section (3) and tighten.
1
3
2
Figure 6. Winter Cover Back Panel Installation (MC-TWPS).
0009 00-8