ARMY TM 10-4610-309-14
MARINE CORPS TM 10802A-14/1
0029 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
OPERATOR INSTRUCTIONS
PREPARATION FOR MOVEMENT MARINE CORPS UNIT
Left End Packout
1. Coil the bisulfite pump discharge, suction, and return tubing together and strap them to the TWPS
frame behind the pump using a 12-in. hook and loop strap.
2. Coil the antiscalant and hypochlorite suction and return tubing together and strap them to the
TWPS frame behind the pump using a 12-in. hook and loop strap.
3. Pack the ground rod sections and the slide hammer rod in the storage brackets at the left front
corner of the skid and secure them with an 18-in. hook and loop strap (see Figure 2).
4. Store the protractor (level) in the protractor (level) storage box (see Figure 2).
PROTRACTOR (LEVEL)
PROTRACTOR (LEVEL)
STORAGE BOX
HOOK AND LOOP STRAP
SLIDE HAMMER ROD
GROUND RODS
Figure 2. Ground and Slide Hammer Rod Storage.
Raw Water Suction Hose Packout
Pack five 3-in. x 10-ft., green-banded raw water suction hoses lengthwise on top of the RO feed tank.
Slide them in, male end first, from the right side of the skid. Be sure the female ends of the hoses don't
stick outside the skid frame. Wrap the right ends of the five hoses together and secure them to the
Pack five additional 3-in. x 10-ft., green-banded raw water suction hoses lengthwise on top of the RO
feed tank. Slide them in, male end first, from the right side of the skid. Be sure the female ends of the
hoses don't stick outside the skid frame. Wrap the right ends of the five hoses together and secure them
to the TWPS using another 10-ft. ratchet strap.
0029 00-17