ARMY TM 10-4610-309-14
MARINE CORPS TM 10802A-14/1
0029 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
OPERATOR INSTRUCTIONS
PREPARATION FOR MOVEMENT MARINE CORPS UNIT
11. With one person inside the operator station area and another outside, feed the power cable
through the skid frame and coil it on top of the BII box and buckets (see Figure 6). Be sure the
coiled-up cable does not stick outside the skid frame.
POWER CABLE
Figure 6. Operator Station Packout 2.
12. Place one of the 3,000-gallon distribution tanks on top of the power cable (see Figure 7):
3000 GALLON
DISTRIBUTION TANK
HOLD DOWN ROD BRACKET
Figure 7. Operator Station Packout 3.
0029 00-20