ARMY TM 10-4610-309-14
MARINE CORPS TM 10802A-14/1
0029 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
OPERATOR INSTRUCTIONS
PREPARATION FOR MOVEMENT MARINE CORPS UNIT
13. Install the fire extinguisher in its bracket next to the S-2 strainer.
14. Attach the long end of a 10-ft. ratchet strap to the center hole of the hold down rod bracket on the
floor below the feed flow control panel and temporarily lay the strap out of the way on top of the
frame above the feed flow control panel (see Figure 7).
WARNING
Three person lift. Three people are required to safely lift Diesel-Driven Pump Skid.
Lift with your legs, not your back. Failure to observe this warning may result in
back injury.
Two person lift. Two people are required to safely lift the Motor-Driven Pump
Skids. Lift with your legs, not your back. Failure to observe this warning may
result in back injury.
15. Place the diesel pump skid sideways on the floor in front of the BII box and buckets, with the
pump end facing out (see Figure 8).
16. Secure the skid with a long retaining rod.
17. Place the two distribution nozzles inside the diesel pump skid and secure them with two 18-in.
hook and loop straps.
DIESEL PUMP SKID
DISTRIBUTION NOZZLES
HOOK AND LOOP STRAP
RETAINING ROD
RETAINING PIN
HOOK AND LOOP STRAP
Figure 8. Operator Station Packout 4.
0029 00-21