ARMY TM 10-4610-309-14
MARINE CORPS TM 10802A-14/1
0029 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
OPERATOR INSTRUCTIONS
PREPARATION FOR MOVEMENT MARINE CORPS UNIT
Operator Station Packout
1. Install the operator station overhead support beam across the front of the operator station using
eight bolts and lock washers (see Figure 3).
2. Wrap the support beam pad around the support beam and secure with the hook and loop strip.
3. Lower and secure the operator station roof (see Figure 3).
a. One person supports the roof while another person removes the roof support retaining
pins.
b. Carefully lower the roof until it rests on the TWPS frame.
c. Secure the roof in the lowered position with the roof support retaining pins.
ROOF ASSEMBLY
RETAINING PIN
SUPPORT BEAM PAD
SUPPORT BEAM
Figure 3. Operator Station Overhead Support Beam and Roof Packout.
0029 00-18