ARMY TM 10-4610-309-14
MARINE CORPS TM10802A-14/1
0036 00
TACTICAL WATER PURIFICATION SYSTEM (TWPS)
OPERATOR MAINTENANCE PROCEDURES
SERVICE UPON RECEIPT
KNOT CAC ROPES
Tie a loop at one end of each of the three CAC ropes as shown in Figure 7.
Figure 7. Loop Tied at End of a CAC Rope.
DEPROCESS UNPACKED EQUIPMENT:
1. Remove the vapor capsules from the OCP, PDP and Instrument Panel. Install new vapor
2. Apply anti-corrosion compound to all areas listed in PMCS (WP 0079, Table 1, item 17).
3. Complete Before Operation PMCS.
4. Pack out the chemicals in the appropriate TWPS storage containers. Refer to WP 0031,
Preparation for Storage Army Unit and WP 0032, Preparation for Storage Marine Corps Unit.
5. Pack-out (repack) the TWPS. Refer to WP 0031, Preparation for Storage Army Unit and WP
0032, Preparation for Storage Marine Corps Unit.
END OF WORK PACKAGE
0036 00-12