TM 10-4610-310-14
0006 00
OFFLOADING THE LWP - continued
WARNING
The chemical module is to be lifted by at least four personnel. Do not attempt to lift any of the
modules with less than four personnel. Serious injury to personnel will result.
7. Offload chemical module from the vehicle. Place in the center of the operational area until the Reverse
Osmosis (RO) element module is offloaded. See Figure 8.
CHEMICAL MODULE
RAMP IS NOT
SHOWN FOR
CLARITY
Figure 9. Offloading Chemical Module.
WARNING
The RO element module is to be lifted by four personnel. Do not attempt to lift any of the
modules with less than four personnel. Serious injury to personnel will result.
8. Ensure the gauges and instruments are all facing the same direction. This will allow correct set up and ease
of operation. All the directional references in the following steps are from the point of view of the operator
facing the equipment.
9. Offload RO element module from the vehicle. Stage the RO module in the center of the LWP operational
area. Make sure the sampling valves are facing the operator. See Figure 8, Figure 10.
RO ELEMENT MODULE
RAMP IS NOT
SHOWN FOR
CLARITY
Figure 10. Offloading Reverse Osmosis Element Module.