TM 10-4610-310-14
0006 00
OFFLOADING THE LWP - continued
16. Stack the control module on top of the chemical module at least 3 inches from the edge of the module. The
switches on the control panel should be facing the operator. See Figure 8.
17. Use a tie-down strap to secure the control module. Place the tie-down strap over the top of the control
module. Connect the strap to the RO element module frame. Do not over tighten.
18. Remove the three small 2.5-gallon chemical tanks from the module and place them on the ground, on the
right side of the RO module near the chemical tubing connection point. See Figure 8.
WARNING
The high-pressure pump module is to be lifted by four personnel. Do not attempt to lift any of
the modules with less than four personnel. Serious injury to personnel will result.
19. Offload the high-pressure pump module from vehicle. See Figure 13.
SETTLING TANK AND
HIGH-PRESSURE PUMP
PRODUCT TANK
MODULE
CABLE BOX
RAMP IS NOT
SHOWN FOR
CLARITY
Figure 13. Offloading High-Pressure Pump Module.
20. Place the high-pressure pump module to the rear of the UF module, approximately 10 feet. See Figure 8.
21. Unload the cable box.
WARNING
The 1000-gallon collapsible fabric tank is to be lifted by two personnel. Do not attempt to lift
any tank with less than two personnel. Serious injury to personnel will result.
22. Unload the two 1000-gallon collapsible fabric tanks.
23. Position the settling tank upstream of the UF module approximately 6 feet.
24. Position the product water tank downstream of the stack of the control module, chemical module, and RO
modules approximately 6 feet. See Figure 8.
25. Unload the cable box.